arrow_down
arrow_down
arrow_down

M1

Exclusive BERD technology. Equipment for in place construction of bridges and viaducts decks, span by span, with large spans (span length between 70 and 100 metres – between 229 to 393 ft.).

M1-90-S

M1-90-S

M1-90-S

M1-90-S

Standard

Equipment for in place construction of bridges and viaducts decks, span by span. (spans between 25 and 70 meters – 82 and 229 ft.)

M30-I

M30x2-S

M35-I

M45-S

M45-S

M45-S

M45-S

M55-S

M60-I

M70-S

M70-S

M70-S

SFC (Super Fast Construction)

Patented method for in place construction of bridges and viaducts decks, span by span, with pre-assembled formwork and rebar modules.