M1
Exclusive BERD technology. Equipment for in place construction of bridges and viaducts decks, span by span, with large spans (span length between 70 and 100 metres – between 229 to 393 ft.).
M1-90-S
M1-90-S
M1-90-S
M1-90-S
Standard
Equipment for in place construction of bridges and viaducts decks, span by span. (spans between 25 and 70 meters – 82 and 229 ft.)
M30-I
M30x2-S
M35-I
M45-S
M45-S
M45-S
M45-S
M55-S
M60-I
M70-S
M70-S
M70-S
SFC (Super Fast Construction)
Patented method for in place construction of bridges and viaducts decks, span by span, with pre-assembled formwork and rebar modules.