After the conclusion of the Sokolov bridge construction in the Czech Republic, the M45-S is now ready for its second application.
The bridge over the Opatovický canal, a 220m metres long bridge, with 12 spans up to 45 m each is located ca 100km east from Prague, Czech Republic.
Due to the new bridge’s specification – plan curvature radius, variable longitudinal and transversal slopes, and V shape piers – some refurbishment operations were needed.
The M45-S in now in the last stage of assembly and the first concrete pouring is scheduled for the end of March.