arrow_down
  • D1 FRICOVCE -SVINIA

    SLOVAKIA (MSS M45-S) 2013-2014

D1 Fricovce Svinia

SLOVAKIA (MSS M45-S) 2013-2014

Location
Presov, Slovakia
Year
2013-2014
Client
Project
Type: Two viaducts, lengths of 167.1m (548 ft) + 254.6m (835 ft.)
Typical Span: 45 m (147 ft.)
Deck width: 28,6 m (93 ft.)
Typical Cross Section: Box
Equipment features
Model: MSS M45-S
Construction Type: In situ (In Place)
Type: Overhead MSS
OPS System: Integrated
Performance: 16-day cycles
Challenges
• Building of 2 relatively short bridges and adapt them for the use Movable Scaffolding System
• Reduction in cost construction
Solutions
• Was developed a transport system for the Movable Scaffolding System from one viaduct to the other without dismantling, using the layout of the road under construction
Results
• Construction period: 23 + 25 weeks