
The bridge will be composed by two parallel decks, with total length of 520 meters, built by BERD’s Movable Scaffolding System M40-I. This underslung MSS, already in the second span, was designed for the construction of the bridge deck fully ensuring design specifications, allowing industrialized cycles and minimal disassembly between viaducts.
Get to know more about this project here.